Flexible Electronics News

First Solar Selected by Tenaska to Build 150MW Solar Facility in Southern California

Project will provide up to 800 construction jobs in the Imperial Valley

Author Image

By: DAVID SAVASTANO

Editor, Ink World Magazine

First Solar, Inc. announced that it has been selected by independent energy company Tenaska Solar Ventures to design and build the 150 megawatt (MW)AC Tenaska Imperial Solar Energy Center West project near El Centro, CA. First Solar will provide full engineering, procurement and construction (EPC) services on the project, employing its advanced thin film photovoltaic modules and single-axis tilt technology. The project sits on approximately 1,100 acres of previously disturbed land in Imperial...

Continue reading this story and get 24/7 access to Ink World magazine for FREE


Already a subscriber? Sign in

Keep Up With Our Content. Subscribe To Ink World magazine Newsletters